Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4230227 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : External Periodical Services To Certain Otm Accn At Cme Under Ge (cme) Khadki |
| Last Date For Submission | 6th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Khadki |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M & L for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss effloerent salts and treading oil and greasy spots and applying two coats of 100% premium acrylic emulsion paint having voc less than 50 gm/litre and UV resistance as per IS 15489 : 2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/10 Sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 Sqm over new surfaces | 17200.00 | Sqm |
| 2 | M & L for one coat of synthetic enamel paint over wooden surfaces including preparation of old surfaces over 10cm width or girth all as specified and directed | 1500.00 | Sqm |
| 3 | M & L for painting one coat synthetic enamel paint on steel surface including preparation of old surface of any description , over 10 cm width or girth not otherwise described all as specified and directed | 1935.00 | Sqm |
| 4 | M & L for preparation of plastered or unplastered old decorated surfaces of ceiling including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss effloerent salts and treading oil and greasy spots and applying one coat of white (lime) wash complete all as spec ified and directed by Engineer-in-Charge | 1200.00 | Sqm |
| 5 | M & L for preparation of old surface of ceiling and applying one coat of oil bound distemper complete all as specified and directed. | 800.00 | Sqm |
6 Days Left