Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: NHDC Limited
Tender ID3609654
Organisation NameNHDC Limited
Tender BriefCorrigendum : Construction Of Club Building At Indira Sagar Power Station, Narmada Nagar, Distt. Khandwa (m.p.)
Last Date For Submission7th Apr, 2026
Opening Date10 Apr, 2026
Cost
Document Cost1770.00
EMD597000.00
Estimated Cost29837118.00
Location
CityKhandwa
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Civil works1.00cum
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil366.93Cum
3Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, Note:-Excavation of hard rock shall be the property of the contractor subject to recovery. excavated material has to shift from site within 15 days after instruction issued by Engineer-In Charge otherwise after this penalty will imposed on contractor at the rate of Rs 50 per cum per day. Ordinary rock550.41Cum
4Excavating trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m including getting out theexcavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : (No extra lift is payable if work is done by mechanical means) in all kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia.60.00Mtr
5Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.482.64Cum
7th Apr, 2026

6 Days Left

WhatsApp