Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3639590 |
|---|---|
| Organisation Name | NHDC Limited |
| Tender Brief | Corrigendum : Construction Of Shed For Hydro-mechanical (hm) Works At Gallery Site On Right Bank Of Indira Sagar Dam At Indira Sagar Power Station, Narmada Nagar, Distt.-khandwa (m.p.). |
| Last Date For Submission | 16th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 66000.00 |
| Estimated Cost | 3281137.00 |
| City | Khandwa |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil | 42.78 | m3 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : With 40mm nominal size graded stone aggregate. M-10Nominal (Mix-1 Cement : 3 sand : 6 graded stone aggregate ) | 2.05 | m3 |
| 3 | Providing and laying in position machine batched, machine mixed cement concrete (BMC) of M-25 grade for reinforced cement concrete work using cement content as per approved mix design including use of admixtures in recommended proportions as per IS 9103 to accelerate/retard setting, improve workability of concrete without impairing strength and durability as per direction of Engineer-in charge and pumping of concrete to site of laying and finishing but excluding the cost of centering, shuttering, and reinforcement. (Note: - Minimum cement content is 330 kg/cum) and no extra payment for extra cement used as per mix design. All works up to plinth level. | 13.02 | m3 |
| 4 | Providing and laying in position machine batched, machine mixed cement concrete (BMC) of M-25 grade for reinforced cement concrete work using cement content as per approved mix design including use of admixtures in recommended proportions as per IS 9103 to accelerate/retard setting, improve workability of concrete without impairing strength and durability as per direction of Engineer-in charge and pumping of concrete to site of laying and finishing but excluding the cost of centering, shuttering, and reinforcement. (Note: - Minimum cement content is 330 kg/cum) and no extra payment for extra cement used as per mix design. Above plinth up to floor 5 | 57.26 | m3 |
| 5 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 12.5mm nominal size). | 6.70 | m2 |