Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Madhya Pradesh Power Generating Company Limited
Tender ID3846831
Organisation NameMadhya Pradesh Power Generating Company Limited
Tender BriefCorrigendum : Work Contract For Construction Of 4 Nos. Rooms With Aluminium Partition/glass Cabin In Power House-2 Building At 3.5 Mtr In Ht Switchgear Room Around Bts Panels To Make Dust Proof At 2x660mw, Sstpp, Stage-ii, Mppgcl, Khandwa
Last Date For Submission30th Apr, 2026
Opening Date04 May, 2026
Cost
Document Cost500.00
EMD16700.00
Estimated Cost833622.00
Location
CityKhandwa
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Work contract for Construction of 4 nos. rooms with aluminium partition/glass cabin in power house-2 building at +3.5 Mtr in HT Switchgear room around BTS panels to make dust proof at 2X660MW SSTPP, Stage-II, MPPGCL, Khandwa.
2construction of 1 nos. room with aluminium partition/glass cabin made with heavy duty aluminium section (3 mtr height, 5mtr length, 3 mtr width) 44.5mm & 100mm size of minimum 12 mm thick novapan laminated sheet or non-transparent glass and from 2 mtr height up to celling level clear glass, providing one door including all required material, labour, T&P etc. So as to complete the work in all respect at power house-2 building at +3.5 Mtr in HT Switchgear room around unit-3 BTS panels to make dust proof/air condition.63Sq. Mtr
3construction of 1 nos. room with aluminium partition/glass cabin made with heavy duty aluminium section (2.5 mtr height, 3.5mtr length, 3 mtr width) 44.5mm & 100mm size of minimum 12 mm thick novapan laminated sheet or non-transparent glass and from 2 mtr height up to celling level clear glass, providing one door including all required material, labour, T&P etc. So as to complete the work in all respect at power house-2 building at +3.5 Mtr in HT Switchgear room around Station switch-board BTS panels to make dust proof/air condition.45Sq. Mtr
4construction of 1 nos. room with aluminium partition/glass cabin made with heavy duty aluminium section (2.8 mtr height, 3 mtr length, 2.5 mtr width) 44.5mm & 100mm size of minimum 12 mm thick novapan laminated sheet or non-transparent glass and from 2 mtr height up to celling level clear glass, providing one door including all required material, labour, T&P etc. So as to complete the work in all respect at power house-2 building at +3.5 Mtr in HT Switchgear room around unit-4 BTS panels to make dust proof/air condition.40Sq. Mtr
5construction of 1 nos. room with aluminium partition/glass cabin made with heavy duty aluminium section (2.8 mtr height, 3 mtr length, 2.5 mtr width) 44.5mm & 100mm size of minimum 12 mm thick novapan laminated sheet or non-transparent glass and from 2 mtr height up to celling level clear glass, providing one door including all required material, labour, T&P etc. So as to complete the work in all respect at power house-2 building at +3.5 Mtr in HT Switchgear room around unit-4 BTS panels to make dust proof/air condition40Sq. Mtr
30th Apr, 2026

5 Days Left

WhatsApp