Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4033426 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Ward No-22 Friends Photo Studio Se Vikrant Ke Makan Tak Cc Dwara Sadak Ka Nirman Kary |
| Last Date For Submission | 8th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 552.00 |
|---|---|
| EMD | 23400.00 |
| Estimated Cost | 233996.00 |
| City | Khatauli |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling sundries brick work/Interlocking tile including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).As per S.I no-691 | 116.78 | Sqm |
| 2 | Disposal of malba | 9.34 | Cum |
| 3 | providing laying spreading and compacted 22.40-53 mm graded stone aggregate with fine sand , laying in uniform compacted layers of 100 mm thick with hand roller in sub base/base course on well prepared surface and compacting including all T&P taxes & labour cess etc as directed by engineer in charges etc all. complete as per technical specification clarse 406. | 13.44 | Cum |
| 4 | Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. As per S.I no new item 9 | 17.84 | Cum |
| 5 | M-150 class brick work (1:6) with cement & fine sand mortar in foundation plinth I/c all comp of work . | 0.33 | Cum |
20 Days Left