Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4262201 |
|---|---|
| Organisation Name | Energy And Petrochemicals Department |
| Tender Brief | Corrigendum : Work Of Attending Electrical Defects Of Various Quarters And Utility Buildings Colony & P/h Area On As & When Required Basis At Wtps. |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 1770.00 |
|---|---|
| EMD | 29196.00 |
| Estimated Cost | 0.00 |
| City | Kheda |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Servicing of Ceiling fan, Table fan, Exhaust fan, Pedestal fan, Bracket fan and cabin fan etc. for removing, shifting at site store by replacing of Bush / Bearing / damaged rubber Garagadi / Bolts etc as per EIC. After servicing re-installation completely at location. Scrap material is to be credited by Agency at site store /Main store. Bush / Bearing / rubber Garagadi will be provided by GSECL. Nut-bolts, quarter pin, oil, greasing to be supplied by Agency. | 200.00 | No |
| 2 | Attending ceiling fan for slow moving defect by replacingnew ISI standard capacitor (Make:- CONCAP / BAJAJ) and scrape material crediting by contractor at site store/Main store and condenser supply by contractor. The Capacitor of Make: Concap /Bajaj is to be supplied by Contractor on his own cost. | 800.00 | No |
| 3 | Replacing/ removal of any type of Fan at Service location from site store & faulty fan shifting at site store. Faulty /working Fan is to be credited by Agency at site store/Main store. Fan will be given by GSECL. Quarter Pin and other miscellaneous material are to be supplied by Contractor on his own cost. | 500.00 | No |
| 4 | Rewinding of Any fan by using supper enamelled copper wire and over hauling and putting in working order with original speed with guarantee for one year with replacement of required material & put back into service satisfactorily as per instruction of Engineers CEM [But without providing bush / Bearing / capacitor etc] [Along with dismantling and re fixing of Fan] scrap copper material retained by contractor. Rewinding using supper enamelled copper wire is in scope of Contractor. | 50.00 | No |
| 5 | Attending staircase & main entrance lightning points defects by checking connection and replacing Screw type Porcelain lamp holders and scrape material crediting by contractor at site store/Main store. Screw type Porcelain lamp holders supplied by Contractor on his own cost. | 600.00 | No |
12 Days Left