| Tender ID | 3772190 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair Of External Electrification Of Omc Including Change Low Tension Wire Of 118(i) Inf Bde Gp Omc At Nimu Mil Stn Under Age (i) Nimu |
| Last Date For Submission | 14th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 29800.00 |
| Estimated Cost | 1490000.00 |
| City | Khumbathang |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out old unserviceable underground cable of any size/ make/ type etc from excavated trenches/ on poles/ passing through pipes etc from different locations complete all as specified and as directed by Engineer-in-Charge. | 875.00 | Running meter |
| 2 | Supply, laying and testing XLPE insulated, screened, PVC bedded galvanised steel strip armoured electric power cable (Heavy duty) with aluminium conductor, 1100 Volts grade lay in trenches, ducts, along pole cross sectional area 120 Sqmm 3.5 Core complete all as specified and as directed by Engineer-in-Charge. | 205.00 | Running meter |
| 3 | Supply, laying and testing XLPE insulated, screened, PVC bedded galvanised steel strip armoured electric power cable (Heavy duty) with aluminium conductor, 1100 Volts grade lay in trenches, ducts, along pole cross sectional area 50 Sqmm 3.5 Core complete all as specified and as directed by Engineer-in-Charge. | 320.00 | Running meter |
| 4 | Supply, laying and testing XLPE insulated, screened, PVC bedded galvanised steel strip armoured electric power cable (Heavy duty) with aluminium conductor, 1100 Volts grade lay in trenches, ducts, along pole cross sectional area 70 Sqmm 3.5 Core complete all as specified and as directed by Engineer-in-Charge. | 350.00 | Running meter |
| 5 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for taking out pipe line etc for repairs / laying cables etc and getting out in soft / loose soil complete all as specified and as directed by Engineer-in-Charge. | 207.90 | Cubic Metre |