Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4888270 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Road/ Hard Standing At Bde Camp And Fd Wksp At Drass Under Ge Kargil |
| Last Date For Submission | 5th Aug, 2026 |
| Opening Date | 06 Aug, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 121500.00 |
| Estimated Cost | 6417000.00 |
| City | Khumbathang |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Repair to potholes any depth, not exc 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sq m, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm. | 1.50 | 10 SQM |
| 2 | Preparing surfaces unsurfaced water macadam by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc all as spd and directed | 50.00 | 10 SQM |
| 3 | Applying evenly a priming/tack coat with bituminous primer using paving bitumen (Viscosity Grade - 10) VG-10 @ 10 kg/10sqm complete all as specified and directed. | 50.00 | 10 SQM |
| 4 | M&L premix bituminous macadam laid/rolled and compacted to required gradient and camber(consolidated thickness 75mm or less) etc 4.0% binder content of paving bitumen VG-30 by weight of total mix rolled and compacted mixed in mechanical hot mixed plant and premixed material laid with mechanical paver finished including rolling to required camber and gradient with 8 to 12 tone power roller to required compaction complete all as specified and as directed | 25.00 | Cubic Metre |
| 5 | Preparing surfaces black top by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc all as spd and directed | 410.00 | 10 SQM |
6 Days Left