Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123891 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | New Construction Of Village Nagla To Hisoti Link Road |
| Last Date For Submission | 5th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 1119000.00 |
| Estimated Cost | 18574000.00 |
| City | Khurja |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART A Bituminous Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 270.00 | Cum |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 8200.00 | Cum |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. as per Technical Specification Clause 401. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 1595.00 | Cum |
| 4 | (Cement Treated Base) providing, laying and spreading in uniform layers with motor grader on a preparedSub base, Cement @ 4% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | 871.00 | Cum |
| 5 | Brick edging on both side of the road with first class brick 7 cm wide. 11 cm deep, laid with mud mortar including labour and supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the engineer-in -charge including cost of all material labour, T&P and labour cess etc. complete but excluding GST | 3.10 | KM |
6 Days Left