Tendering Authority: Cochin Shipyard Limited
Tender ID4097564
Organisation NameCochin Shipyard Limited
Tender BriefCorrigendum : Execution Of Balance Civil Works In Etp/stp At Csl-isrf
Last Date For Submission15th May, 2026
Opening Date16 May, 2026
Cost
Document Cost0.00
EMD86000.00
Estimated Cost4300000.00
Location
CityKochi
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Civil works
2Cleaning of ETP/STP tanks including dewatering, removal of all debris, shuttering materials, and algae/vegetagion(if any), including disposal of debris at ISRF scrap yard including cost of all materials, equipments, labour, tools and tackles etc. all complete as directed by Engineer-in-charge. Note : This item shall be payable only once at start of work and subsequent cleaning & dewatering shall be carried out by contractor at no extra cost to CSL. Refer the photo attached at Appendix to BOQ1LS
3Cutting and removal of the projected tie rods, reinforcement rods and binding wires embedded in concrete inside ETP/STP underground tanks and repairing the concrete surface (using Sika Emaco S 348 make or equivalent) as per approved methodology (Annexure-1) including all labour, machinery, materials, incidental expenses all complete as directed by Engineer-In-Charge. Refer the photo attached at Appendix to BOQ100Nos
4Carrying out repair works on construction joints of tank walls and other areas including honeycomb rectification (using Sika Emaco S 348 make or equivalent) with surface preparation, sealing, finishing and repairing all affected area as per approved methodology (Annexure-1) and specifications including cost of all machineries, materials, equipment, tools and tackles, labour, curing, etc. all complete as directed by Engineer-In-Charge. Refer the photo attached at Appendix to BOQ70Sqm
5Rectification of leakage of water from joints of intermediate walls inside ETP/STP tanks by injection grouting (using Injection packers, Foam Injection 101 IN and Resin injection 201 N of Sika make or equivalent) and making all concrete surfaces water tight including surface sealing and finishing etc. all complete as per approved methodology (Annexure-2) and specifications including cost of all machineries, materials, equipment, tools and tackles, labour, curing, incidental expenses etc. all complete as directed by Engineer-In-Charge. Refer the photo attached at Appendix to BOQ45Rm