Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4097564 |
|---|---|
| Organisation Name | Cochin Shipyard Limited |
| Tender Brief | Corrigendum : Execution Of Balance Civil Works In Etp/stp At Csl-isrf |
| Last Date For Submission | 15th May, 2026 |
| Opening Date | 16 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 86000.00 |
| Estimated Cost | 4300000.00 |
| City | Kochi |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Civil works | ||
| 2 | Cleaning of ETP/STP tanks including dewatering, removal of all debris, shuttering materials, and algae/vegetagion(if any), including disposal of debris at ISRF scrap yard including cost of all materials, equipments, labour, tools and tackles etc. all complete as directed by Engineer-in-charge. Note : This item shall be payable only once at start of work and subsequent cleaning & dewatering shall be carried out by contractor at no extra cost to CSL. Refer the photo attached at Appendix to BOQ | 1 | LS |
| 3 | Cutting and removal of the projected tie rods, reinforcement rods and binding wires embedded in concrete inside ETP/STP underground tanks and repairing the concrete surface (using Sika Emaco S 348 make or equivalent) as per approved methodology (Annexure-1) including all labour, machinery, materials, incidental expenses all complete as directed by Engineer-In-Charge. Refer the photo attached at Appendix to BOQ | 100 | Nos |
| 4 | Carrying out repair works on construction joints of tank walls and other areas including honeycomb rectification (using Sika Emaco S 348 make or equivalent) with surface preparation, sealing, finishing and repairing all affected area as per approved methodology (Annexure-1) and specifications including cost of all machineries, materials, equipment, tools and tackles, labour, curing, etc. all complete as directed by Engineer-In-Charge. Refer the photo attached at Appendix to BOQ | 70 | Sqm |
| 5 | Rectification of leakage of water from joints of intermediate walls inside ETP/STP tanks by injection grouting (using Injection packers, Foam Injection 101 IN and Resin injection 201 N of Sika make or equivalent) and making all concrete surfaces water tight including surface sealing and finishing etc. all complete as per approved methodology (Annexure-2) and specifications including cost of all machineries, materials, equipment, tools and tackles, labour, curing, incidental expenses etc. all complete as directed by Engineer-In-Charge. Refer the photo attached at Appendix to BOQ | 45 | Rm |
8 Days Left