| Tender ID | 4405016 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Annual Plan-pro-no-107/26- Kandala N C P C D W S Koduvally Muncipality |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 560.00 |
|---|---|
| EMD | 6352.00 |
| Estimated Cost | 254088.00 |
| City | Koduvally |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Maintanace work for D W S | ||
| 2 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.173 | cum |
| 3 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc | 20.000 | kg |
| 4 | 11.43:Fixing glazed/ Ceramic/ Vitrified floor tiles with cement based high polymer modified quick-set tile adhesive ( Water based) conforming to IS : 15477, in average 3 mm thickness. | 44.450 | sqm |
| 5 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 44.450 | sqm |