Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4443737 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Improvement Of Road Mdr 26 To Panore Tal -panhala Vr 78 (0/00 To 0/688)(fdr) |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 15 Jun, 2026 |
| Document Cost | 8000.00 |
|---|---|
| EMD | 48843.00 |
| Estimated Cost | 4884339.00 |
| City | Kolhapur |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50 metres outside the periphery of the area. Item / Page No : 7 / 23 Specification No : MoRTH 201 Spec. Page No : --- Additional Specifications : Where only grass is met with, the area cleared will be measured and paid for under this item. | 550.0000 | Square Metre |
| 2 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means. Item / Page No : 11 / 23 Specification No : MORTH-301 Spec. Page No : 45-53 | 401.0100 | Cubic Metre |
| 3 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 60 milimetre metal, by breaking rubble obtained by blasting. (Hand broken). Item / Page No : 54A / 345 Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | 348.7000 | Cubic Metre |
| 4 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 40 milimetre metal, by breaking rubble obtained by blasting. (Hand broken). Item / Page No : 55 / 345 Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | 224.9000 | Cubic Metre |
| 5 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. Item / Page No : 29a / 25 Specification No : MORTH-408 Spec. Page No : 139-142 | 225.0500 | Cubic Metre |
12 Days Left