Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4464806 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Repairs Of Pwss Tembi To Labaji Mala Waki Daingade Mala Balu Lakmapure Bali Mali To Sunil Mali At Kasba Sangaon Tal Kagal Dist Kolhapur |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 09 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 5281.00 |
| Estimated Cost | 528139.00 |
| City | Kolhapur |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for pipe trenches in earth soils of all types of sand.gravel & soft murum including removing the excavated material up to a distance of 50 M & lift as below stacking & spreading as directed normal de watering preparing the bed for foundation excluding back filling etc complete Lift 0.00 to 1.50 m | 148.050 | Cubic Metre |
| 2 | Excavation for foundation /pipe trenches in hard murum and boulders WBM road including removing the excavated material up to a distance of 50 m and lifts as below, stacking & spreading as directed normal dewatering preparing bed for foundation excluding backfilling etc complete. | 148.050 | Cubic Metre |
| 3 | Excavation for pipe trenches in soft rock old cement & lime masonry foundation as including removing the excavated material up to a distance of 50 m. beyond the area & lifts as below stacking, spreading as directed. normal de watering preparing bed excluding back filling etc. | 123.375 | Cubic Metre |
| 4 | Excavation for pipe trenches in hard rock and concrete road by chiseling, wedging, line drilling by mechanical means or by any other means other than blasting including trimming and leveling the bed, removing the excavated material up to a distance of 50 m and lifts as below stacking as directed, normal de watering excluding back filling etc complete | 74.025 | Cubic Metre |
| 5 | Filling in plinth & floors murum bedding in trenches with approved murum from excavated materials from excavated material from foundation 15 cm s to 20 cm s layers including watering & compaction etc complete | 74.025 | Cubic Metre |