Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kolkata Municipal Corporation
Tender ID4963825
Organisation NameKolkata Municipal Corporation
Tender BriefCorrigendum : Arrangement Of Dewatering For Urgent Maintenance Work On 1400 Mm Diameter Inlet Main Near Klotan Villa Daspara
Last Date For Submission3rd Aug, 2026
Opening Date05 Aug, 2026
Cost
Document Cost0.00
EMD3000.00
Estimated Cost140327.00
Location
CityKolkata
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]3008HORSE POWER HOUR
2CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.26 Hire charges of moveable crane with fuel & manpower having load handling capacity upto 14MT with the 45 deg. moveable arrangement & the boom length of 40 feets for loading & unloading of various materials / accessories of water supply works. For minimum engagement of 8 hrs. In a day2DAILY
3MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.8EACH
4Sub Total
5GST 18%1.000NOS
3rd Aug, 2026

10 Days Left

WhatsApp