Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: New Town Kolkata Development Authority
Tender ID3728081
Organisation NameNew Town Kolkata Development Authority
Tender BriefCorrigendum : Canal Lining Work With Cement Concrete Block And One Side Chain Link Fencing Along The Embankment For Canal F Including Replacement Of 10 Nos H.p. Culvert By 3 Cell (3mx3m) Box Culvert In Action Area I, New Town, Kolkata
Last Date For Submission11th May, 2026
Opening Date13 May, 2026
Cost
Document Cost0.00
EMD2909117.00
Estimated Cost145455839.00
Location
CityKolkata
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30cm. girth including removing as directed by Engineer-in-charge.27560.00Sqm
2Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them out side Government land including all leads and lifts to stack in a nearby available space complete.17914.00Sqm
3Earth work in excavation or re-excavation of drainage channels/ rivers in all kinds of soil including silt, sand, slush etc. mixed with all sorts of Industrial wastes, sewages, municipal garbage, carcasses, tannery effluents, jungles, bushes, semi-solid / solid campact mass, water hyacinth, cowdung deposits, decomposed vegetations, polythenes, brick bats, gravels, stone ballast, crates, remnant of bullah and bamboo pins etc. by means of suitable excavator mounted on pontoon (min. depth of water 0.75metre) specially made to suit the site condition in tidal or non-tidal channel /river and carrying of the excavated materials to suitable locations of the channel / river bank from the point of excavation by diesel machine operated boats or similar arrangements in amanner suited for the purpose and placing the excavated materials from the boat etc.on the top of the bank in case of disposal at suitable places arranged by the agency at his own cost, on the bank at available location shaving distances from the point of re-excavation asshown below, by means of excavators or any other machines or manually as may be required, including all lifts. Measurement : By Pre-work and Post-work level sections. Pre-work level for the existing bed of the channel / river is to be taken bydisplacing water hyacinth and all other floating materials including compact masses, carcasses etc.and for which no extra payment will be made. Post-work level section will be taken only when a stretch of at least 300metre is completed and the said post-work will be taken within 7 days after completion of excavation in that reach. (a)For distance 0 to 50metre from the point of re-excavation to the placing point on the bank.13780.00Cum
4Disposal / carriage of excavated earth /materials out side Government land by truckor by any other conveyan ceover kancha / pucca road including making access for plying the truckor anyother conveyance beyond 300m from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete Measurement :By stacks at loading point after deducting voids as per rule. (This item can only be used after obtaining permission from the concerned Superintending Engineer)12248.89Cum
5Earth work in excavation of foundation trenches or drains, inall sorts of soil (including mixed soil but excluding lateriteor sandstone) including removing, spreading or stacking the spoils with in a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.3796.37%Cum.
11th May, 2026

32 Days Left