| Tender ID | 4888905 |
|---|---|
| Organisation Name | Kolkata Metropolitan Development Authority |
| Tender Brief | Corrigendum : Carriageway And Structural Restoration Work On All Bridges At North Kolkata Zone Under The Control Of Kalyani Construction Division Roads And Bridges Sector Kmda |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 16340.00 |
| Estimated Cost | 816981.00 |
| City | Kolkata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 8.64 | %Cum |
| 2 | Dismantling of Structures Dismantling of existing structures like culverts, bridges,retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means Reinforced Cement Concrete | 2.50 | Cu.M |
| 3 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 1.92 | %Cum |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 9.60 | SqM. |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness withrequired bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 14.46 | Sq.M |