Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4784714 |
|---|---|
| Organisation Name | West Bengal State Electricity Distribution Company Limited |
| Tender Brief | Corrigendum : Construction Of Control Room Building And Other Civil Works For Setting Up New 33/11 Kv Spread Out Type Sub-station With (2x6.3) Mva Power Transformer Including Electrical Wiring At Jogeshganj, Basirhat Division Under North-24 Parganas Region. |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 05 Aug, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 364856.00 |
| Estimated Cost | 18242794.00 |
| City | Kolkata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | CIVIL WORKS: (In riverine areas connected by river route and/or ferry crossing under Extra Rate @ 22.5% for Gosaba, Basanti, Sandeshkhali, Hingalganj & Minakhan P. S.) Earth work in excavation of foundation trenchesor drains, in all sorts of soil(including mixed soil but excluding laterite or sand stone)including removing spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing & ramming the bottom, bailing out water etc. as required complete. (a) Depth of excavation not exeeding 1500mm | 930.00 | cum |
| 2 | (b) Depth of excavation for additional depth beyond 1500mm and upto 3000mm but not required shoring. | 200.00 | cum |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete (A) with earth obtained from excavation of foundation. | 520.00 | cum |
| 4 | Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (b) (i) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | 2050.00 | cum |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. measurement of finished quantity)(payment to be made on measurement of finished quantity). | 220.00 | cum |
10 Days Left