Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: West Bengal Electronics Industry Development Corporation Limited
Tender ID4362348
Organisation NameWest Bengal Electronics Industry Development Corporation Limited
Tender BriefCorrigendum : Construction Of New Vat At Taratala Complex
Last Date For Submission8th Jun, 2026
Opening Date10 Jun, 2026
Cost
Document Cost500.00
EMD6750.00
Estimated Cost335844.00
Location
CityKolkata
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed.The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm.28.000cum
2Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Soling or dry pavement with one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm)72.000sqm
3Brick work with 1st class bricks in cement mortar (1:4) In superstructure, ground floor10.000cum
4Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety9.000cum
5Artificial stone in floor, dado, stair case etc with cement concrete (1:2:4)with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3mm. thick topping(High polishing grinding on this item is not permitted with ordinary cement) Using grey cement 35 mm. thick70.000sqm