| Tender ID | 3666288 |
|---|---|
| Organisation Name | West Bengal Transport Infrastructure Development Corporation Limited |
| Tender Brief | Corrigendum : Construction / Re-construction Of Areas Within 500m From The Jutemill Ghat In Halisahar, Sheoraphuli Ghat In Baidyabati, Naihati Ghat In Naihati Municipality, Ratan Babu Ghat In Kma And Dhobi Ghat In Kma At Wb For Urban Upgradation Area.(5 Lots) |
| Last Date For Submission | 5th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 1594916.00 |
| Estimated Cost | 79745800.00 |
| City | Kolkata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Naihati Civil Work Mahotsavtala | ||
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | 28.47 | Cum |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation | 20.900 | Cum |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codesa) Pakur Variety | 6.070 | Cum |
| 5 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix formula. In ground floor and foundation.[using concrete mixture] (b) M 25 Grade | 1.500 | Cum |