Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kolkata Municipal Corporation
Tender ID4343280
Organisation NameKolkata Municipal Corporation
Tender BriefCorrigendum : Development Of Childrens Park Of Bhagini Nivedita Uddyan In Ward No-07 Under Br-i.
Last Date For Submission12th Jun, 2026
Opening Date15 Jun, 2026
Cost
Document Cost0.00
EMD16000.00
Estimated Cost798535.00
Location
CityKolkata
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.25EA
2BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)148.5SQM
3BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)14.85M3
4BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth. ( 3rd Corrigenda & addenda dated 04.06.2018)1.62M3
5BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 31. Supplying, fitting & fixing granite tiles 10mm to 12mm. thick in columns, wall, facia etc. with 15 thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all materials, labours, scaffolding, staging ,curing and roughening of concrete surface complete. [Using cement slurry at back side of tiles@ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m] Area of each slab upto 0.2 Sq.m (3rd Corrigenda & addenda dated 04.06.2018)21.12SQM
12th Jun, 2026

8 Days Left

WhatsApp