Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kolkata Metropolitan Development Authority
Tender ID4337277
Organisation NameKolkata Metropolitan Development Authority
Tender BriefCorrigendum : Repairing And Renovation Work Of Quarter No. 1 (flat- No. 01) On First Floor At Subhas Sarobar In Kit Scheme No. Lxxxv, 46, Suren Sarkar Road,kolkata-700010 Under Housing Sector, Kmda
Last Date For Submission10th Jun, 2026
Opening Date12 Jun, 2026
Cost
Document Cost0.00
EMD3850.00
Estimated Cost192086.00
Location
CityKolkata
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1(i) Chromium plated round shower with revolving joint 100 mm dia with rubid cleaning system Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6cement) as per Manufacturer's specification10.00Sqm
2Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P.M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X.P.M. & cost of all handling and scaffolding complete as per direction of Engineer-in charge, a) 37.5mm thick10.00Sqm
3Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:4 cement mortar 15 mm thick plaster40.00Sqm
410 mm thick plaster10.00Sqm
5Wood work in door & window frame fitted and fixed in position complete including a protective cost of painting at the contact surface of the frame excluding cost of concrete, iron Butt Hinges and M.S. clamp (The quantum should be correted upto three decimals). b)Ordinary teak. a) At ground floor.0.05Cum
10th Jun, 2026

14 Days Left

WhatsApp