Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4244234 |
|---|---|
| Organisation Name | Kolkata Port Trust |
| Tender Brief | Miscellaneous Necessary Repair Work To Make Various Roads Under The Se (kol) Division Motorable, Along With Other Allied Works, For A Period Of One (01) Year |
| Last Date For Submission | 2nd Jun, 2026 |
| Opening Date | 03 Jun, 2026 |
| Document Cost | 1770.00 |
|---|---|
| EMD | 121563.00 |
| Estimated Cost | 6078117.00 |
| City | Kolkata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials. For average depth above 75 mm but not exceeding 150 mm by manual means: Stone-metal surface. | 250.00 | Sqm. |
| 2 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials. For average depth above 75 mm but not exceeding 150 mm by manual means: Brick / Jhama metal surface. | 250.00 | Sqm. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500 mm. | 100.00 | Cum |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) a) With earth obtained from excavation of foundation. | 80.00 | Cum |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation withwater, ramming complete including the cost of supply of sand. (payment to be made on measurement offinished quantity) | 80.00 | Cum |
21 Days Left