Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4241568 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Deposit Rwss To Adichanalloor Disconnection Of Unusable Public Taps In Adichanalloor Grama Panchayath Pipeline Work |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 3295.00 |
| Estimated Cost | 131814.00 |
| City | Kollam |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART 1 | ||
| 2 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 210.000 | metre |
| 3 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.000 | cum |
| 4 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 15.000 | sqm |
| 5 | 100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites. | 15.000 | sqm |
7 Days Left