Tendering Authority: Public Works Department
Tender ID4121459
Organisation NamePublic Works Department
Tender BriefCorrigendum : Road Construction Work From Kherula Drain To Bagavada Drain.
Last Date For Submission14th May, 2026
Opening Date15 May, 2026
Cost
Document Cost2000.00
EMD264360.00
Estimated Cost13218000.00
Location
CityKota
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle1.54Hectare
2Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses180.94Cum
3Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.34139.85Cum
4Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge4139.85Cum
5Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km.3256.88Cum
14th May, 2026

2 Days Left