Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3838853 |
|---|---|
| Organisation Name | Urban Improvement Trust |
| Tender Brief | Corrigendum : Various Civil Repairing Work In Zone-iii-a Area (arc) |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 600000.00 |
| Estimated Cost | 30000000.00 |
| City | Kota |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 5000.00 | Sqm |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 500.00 | Cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 700.00 | Cum |
| 4 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in Hard rock (requiring blasting) useful material 30% | 200.00 | Cum |
| 5 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix | 380.00 | Cum |
22 Days Left