Tender ID5026623
Organisation NameLocal Self Government Department
Tender BriefAnnual Plan-erattupetta Muncipality Project No 39/26-27-karakkad Nadackal Haji Vma Kareem Sahib Road Maintenance Ward 9 (5l)
Last Date For Submission29th Jul, 2026
Opening Date30 Jul, 2026
Cost
Document Cost935.00
EMD10583.00
Estimated Cost423303.00
Location
CityKottayam
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Road Maintenance
23.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.142.400sqm
34.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead13.860cum
44.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material5.520cum
575.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.123.400sqm
29th Jul, 2026

8 Days Left