Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala State Electricity Board
Tender ID3656234
Organisation NameKerala State Electricity Board
Tender BriefCorrigendum : Drip Ii - Kas -maintenance To Radial Gates _ Hoist Mechanism And Pressure Washing On The Downstream Portion Of The Non-overflow Portion Of Kuttiyadi Augmentation Spillway Dam (banasurasagar Dam)
Last Date For Submission24th Apr, 2026
Opening Date24 Apr, 2026
Cost
Document Cost5900.00
EMD50000.00
Estimated Cost8815000.00
Location
CityKottayam
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1CIVIL WORKS
2Cleaning the downstream face of the dam and its appurtenances by removing dirt,dust, bird excretion, grease, oil, algae, fungus, monkey beats, vegetable growth etc.including washing the surface with the help of required scrubbers and also cleaning with machine operated water jet without causing any damage to the surface and finally washing the surface with clean water with the help of pressure jet machine, complete in all respect, including taking all precautions to safeguard structure, all as per direction of Engineer-in-charge (The rate is inclusive of cost of all materials, labours , scafoldings, winch and craddle platform etc complete and provision for ESMP compliance ) 6910.00sqm
3Filling cavities/Honey combs on the downstream face of the dam with cement mortar 1:3 using bonding agent Nitobond SBR/equivalent materials, filling of voids and small openings with high strength nonshrink UV resistant,abrasion and chemical resistant impermeable cementitious mortar having minimum adhesive bond strength of 2 Mpa and confirming to EN 1504(Class R4) standards and then resurfacing with the same material for a thickness of 12mm including patch work,scaffolding, cost and conveyance of all materials and all labour charge for watering curing etc and disposal of rubbish to the dumping ground within 50 meters lead etc complete as per the direction of Engineer in Charge.(The rate is inclusive of cost of all materials, labours , scafoldings, winch and craddle platform etc complete and provision for ESMP compliance ) 5.00sqm
4Removing fungi, dust, dirt, rust etc from all surface by manualy/mechanicaly using water, scrapping, sand papering and preparing the surface smooth etc. complete as per the direction of Engineer- in -charge.(The rate is inclusive of cost of all materials, labours , scafoldings, etc complete and provision for ESMP compliance ) 3980.00sqm
5Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:3980.00sqm
24th Apr, 2026

13 Days Left

WhatsApp