| Tender ID | 3888372 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Higher Secondary Razloo Kund Devsar (biology Room) |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 08 Apr, 2026 |
| Document Cost | 1600.00 |
|---|---|
| EMD | 106080.00 |
| Estimated Cost | 5304000.00 |
| City | Kulgam |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : i/c back filling of same inside plinth and clearance of site after completion of work complete. | 98.73 | Cum |
| 2 | Providing and laying stone soling by way of Nallah boulders size on level ( Hand packed ) Watering ,ramming complete below foundation & rooms including carriage of material. | 73.55 | Cum |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 14.59 | Cum |
| 4 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | 20.67 | Cum |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 ,landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate | 40.37 | Cum |