Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4789593 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Boys Toilet (01 Unit) At Govt. Middle School Agroo Devsar Under Pm Samagra 2025-26. |
| Last Date For Submission | 16th Jul, 2026 |
| Opening Date | 17 Jul, 2026 |
| Document Cost | 200.00 |
|---|---|
| EMD | 4680.00 |
| Estimated Cost | 234000.00 |
| City | Kulgam |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : i/c dewatering of trenches and disposal of surplus excavated earth, back filling of same inside plinth and clearance of site after completion of work complete. | 12.12 | Cum |
| 2 | Providing & Laying of stone Nalla boulders (dully hand packed)including dressing and ramming with all carriages loading un-loading and stacking etc complete | 1.77 | Cum |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 0.95 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level :1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.58 | Cum |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement:1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.44 | Cum |
9 Days Left