| Tender ID | 3990221 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction of R/wall Alongwith Pcc Toe Wall At Rd-1/636 To 1/646.80) (under Pdna). |
| Last Date For Submission | 18th Apr, 2026 |
| Opening Date | 18 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 22000.00 |
| Estimated Cost | 1091063.00 |
| City | Kullu |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in earth work for structure in all heights and depths in all kinds of soil including ordinay rock,hard rock (Requiring blasting), hard rock(blasting prohibited), marshy soil and their intermediate classification. If water is met due to stream flow, seepage, rain and other causes it shall be removed by suitable diversion, pumping and bailing out and the excavation shall be kept dry whenever so required by the contractor at his own cost , including dressing of slopes and beds setting out conforming to required lines, grades , side slopes as shown in the drawing and as per direction of Engineer-in-charge and transportation of soil to road way after back filling and then disposing of surplus excavated earth in acquired width of road or on approved dumping sites including its stacking, leveling and dressing in all leads and lifts through all modes of transportation including head load animal load or mechanical means or other incidentals to complete the work as per technical specifications clause 305.1. All useful materials,such as stone shingles, agg. and slates shall be sorted out and stacked along road sides to the maximum possible extent in all leads and lifts. Any loss to the public and private property during the course of execution of disposal of serviceable and un-serviceable materials shall be absolute responsibility of the contractor which shall have to be duly compensated by him in all respects. | 86.94 | Per cubic metre. |
| 2 | Providing and laying cement concrete for plain/reinfocement concrete 1:6:12 (One cement : Six sand :twelve graded stone aggregate 40mm (forty miilimetre nominal size) mechanically mixed in open foundations and plinths complele as per drawings and H.P.P.W.D.specification &MORD technical specification and curing complete including the cost of form work and hauling/carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-charge. | 8.61 | Per cubic metre. |
| 3 | Providing concrete for plain reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202 and 1203 1:3:6 (one cement : three sand : six graded stone aggregate graded stone aggregate 40mm (forty miilimetre nominal size) including the cost of form work and curing complete and hauling/carriage of all labour, equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-charge. | 73.75 | Per cubic metre. |
| 4 | Random rubble stone masonry in cement mortar 1:6 (one cement: six sand) for sub structure as per drawing and techanical specification of Ministry of Rural Development for Rural road clause 702,704,1202 and 1204 including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts to the entire satisfaction as per direction of Engineer-in-charge. | 39.48 | Per cubic metre. |
| 5 | Construction of dry rubble stone masonry for Retaining walls, breast walls, revetment walls and parapets etc for sub-structure and super structure complete as per drawing and technical specification of Ministry of Rural Development for Rural road clause 704.6 and 1302.5 including hauling/ carriage of all labour equipment and materials to various location through all modes of transportation. with in all leads and lift of materials and as per direction of Engineer-in-charge. | 47.71 | Per cubic metre. |