Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4032704
Organisation NamePublic Works Department
Tender BriefConstruction of Wire Crated R/wall At Rd-1/170 To 1/789 And Construction of H/pipe Culvert 900 Mm Dia At Rd-0/700).
Last Date For Submission22nd Apr, 2026
Opening Date22 Apr, 2026
Cost
Document Cost350.00
EMD17000.00
Estimated Cost838438.00
Location
CityKullu
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in earth work for structure in all heights and depths in all kinds of soil including ordinay rock,hard rock (Requiring blasting), hard rock(blasting prohibited), marshy soil and their intermediate classification. If water is met due to stream flow, seepage, rain and other causes it shall be removed by suitable diversion, pumping and bailing out and the excavation shall be kept dry whenever so required by the contractor at his own cost , including dressing of slopes and beds setting out conforming to required lines, grades , side slopes as shown in the drawing and as per direction of Engineer-in-charge and transportation of soil to road way after back filling and then disposing of surplus excavated earth in acquired width of road or on approved dumping sites including its stacking, leveling and dressing in all leads and lifts through all modes of transportation including head load animal load or mechanical means or other incidentals to complete the work as per technical specifications clause 305.1. All useful materials,such as stone shingles, agg. and slates shall be sorted out and stacked along road sides to the maximum possible extent in all leads and lifts. Any loss to the public and private property during the course of execution of disposal of serviceable and un-serviceable materials shall be absolute responsibility of the contractor which shall have to be duly compensated by him in all respects.145.35Per cubic metre.
2Stone masonry in cement mortar for sub structure complete as per drawing and technical specification clause 702,704,1202 and 1204 in cement mortar 1:5 (one cement: five sand) within all leads and lift of materials and as per direction of Engineer-in- charge6.59Per cubic metre.
3Providing and laying reinforced cement concrete pipe NP3 (900mm dia for culverts on 1st class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection work and back filling and concrete work in head wall and paraptes clause 1106. within all leads and lift of materials and as per direction of Engineer-in- charge6.50Per Running metre.
4Providing and laying of dry rubble flooring complete as per drawings and technical specification clause 1303.3 including cariage of all labour requipment and material to various location through all modes of transportation. with in all leads and lifts complete as per entire satisfection of Engineer- in- charge.1.17Per cubic metre.
5Providing and laying cement concrete for plain/reinfocement concrete 1:6:12 (One cement : Six sand :twelve graded stone aggregate 40mm (forty miilimetre nominal size) mechanically mixed in open foundations and plinths complele as per drawings and H.P.P.W.D.specification &MORD technical specification and curing complete including the cost of form work and hauling/carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer-in-charge.6.55Per cubic metre.