| Tender ID | 5019687 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Rrd On Nagar Jana Bijlimahadev Road Km. |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 12700.00 |
| Estimated Cost | 633010.00 |
| City | Kullu |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in soil in hilly area by manual means including cutting and trimming of side slopes and disposing of excavated earth with all leads & lift ,as per drawing and technical specification clause 1603.1 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 39.00 | Per cubic metre |
| 2 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 15.90 | Per cubic metre |
| 3 | Providing and laying of boulder apron laid in wire crates with 4mm (Four millimetre ) dia GI wire conforming to IS: 280 and IS: 4826 in 100mmx 100mm(One hundred millimetre into One hundred millimetre ) mesh (woven diagonally ) including 10 (Ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 kg.(Twenty five kilogram ) each as per drawing and technical specifications clause 1301within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Governmen tincluding GST. | 187.50 | Per cubic metre |