Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4941232 |
|---|---|
| Organisation Name | Forest Department |
| Tender Brief | Corrigendum : Maintenance Of Elephant Proof Trench At Mullakkudy In Thekkady Range During 2026-27 |
| Last Date For Submission | 23rd Jul, 2026 |
| Opening Date | 25 Jul, 2026 |
| Document Cost | 850.00 |
|---|---|
| EMD | 9000.00 |
| Estimated Cost | 358000.00 |
| City | Kumily |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1164.00 | sqm |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 18.00 | cum |
| 3 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (blasting prohibited) | 54.06 | cum |
| 4 | Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm in size from stack at site and dumping in position (60% 45m , 30% 30 to 40dm and 10% 20 to 30dm stones) to lines and levels to form the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | 54.06 | cum |
| 5 | DR with Departmental Stone - DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 54.06 | cum |
1 Days Left