Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4498888 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Comprehensive Maint, Repair To Sewage Line, Gate, Fencing, Drain, Culvert, Periodical Services Etc In The Aor Of Age B/r-iii Under Ge 874 Ews. |
| Last Date For Submission | 1st Jul, 2026 |
| Opening Date | 08 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 1500000.00 |
| City | Kupwara |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out/pumping out sewage water from septic tank/soakage well from vehicle with attached water tank of 3000 ltr capacity with mechanical pump and sucking and removing and dumping of the same place at the place marked for the purpose by the authority controlling the area, distance for removal from original point to disposal point is marked by the GE complete all as specified and directed. | 30.00 | Each trip |
| 2 | M & L second class soft wood in scantling clean swan below or above ground level upto four storey building, including dismantling timber scantling 40 Sqcm and over in section in any position in unframed work complete all as specified and directed. | 2.00 | Cum |
| 3 | All as per item 2 above but except timber including Dismantling timber scantling 40 Sqcm and over in section in any position in unframed work. | 1.00 | Cum |
| 4 | S & F in repair Vitreous China Urinal, Half stall type, white with grating and union for discharge pipe including providing and fixing plugs with and including 60mm long brass screws, pointing around urinal back in cement with PVC 32mm dia waste pipe & waste coupling including spreader complete all as specified and directed | 9.00 | Each |
| 5 | S&F in repairs Vitreous China Wash down water closet pan (Pedestal pattern), white including plastic water closet seat and cover closed pattern with flat bottom and mild steel chromium plated or aluminised hinging device & including P or S trap and connection to trap and to the flushing system anti syphonage pipe etc (excluding flushing cistern and flush pipe) complete all as specified and as directed. | 15.00 | Each |
6 Days Left