Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4382479 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Macdemization Of Road From Main Road To Khazir Mohammad Lone Gagal B And Main Road To Mohd Akbar Lone And Imtiyaz Lone Gagal |
| Last Date For Submission | 3rd Jun, 2026 |
| Opening Date | 04 Jun, 2026 |
| Document Cost | 1100.00 |
|---|---|
| EMD | 79000.00 |
| Estimated Cost | 0.00 |
| City | Kupwara |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface Dressing of the ground incl removing vegitation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m | 2070.000 | Sqm |
| 2 | Supply and filling of nallah muck in 15cm layers complete job incl rolling with 10-15 ton PRR, incl dressing watering all complete job | 155.250 | Cum |
| 3 | WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 258.750 | Cum |
| 4 | TACK COAT Providing & applying hot straight run bitumen of VG-10 grade including heating the bitumen,spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler , cleaning & preparing the existing road surface to remove all dirt,dust,mud etc & finally brooming the surface as per required specifications. On W.B.M. @ 0.75 Kg/sqm. | 3450.000 | Sqm |
| 5 | BITUMINOUS MACADAM P/L 50 mm thick compacted bituminous macadam base course with stone aggregate of quality size & grading as specified in MOST specifications & straight run bitumen of VG-10 grade @ 3.3 % by weight of the mix including hot mixing of stone aggrgate & bitumen in HMP ,transporting & laying mixed material with paver finisher to the required line & grade, rolling with road roller of 8 t0 10 ton capacity to achieve the required compaction & density incl cost & carriage of all materials upto the site of work complete. | 172.500 | Cum |
3 Days Left