Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4946347
Organisation NamePublic Works Department
Tender BriefCorrigendum : Patch Repair Work On Mdr/odr Category Roads Within The Dudahi And Tamkuhi Development Blocks, Under The Tamkuhi Assembly Constituency
Last Date For Submission25th Jul, 2026
Opening Date25 Jul, 2026
Cost
Document Cost944.00
EMD102000.00
Estimated Cost1020000.00
Location
CityKushinagar
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Wet Mix macadam(Plant mix method) Providing, laying, spreading and compacting stone aggregates from approved quarry to Wet Mix macadam specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub basae/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH specification 406.(Excluding GST).22.00cum
2Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 percent by weight of total mix and filler, fransporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects.(Excluding GST).14.00cum
3Tack Coat Providing and applying tack coat ( over bituminous surface) with bitumen (VG-10) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. As perSr No. 5.2 & MoRT&H Specification Ref. No. 503 (Including Cost of bitumen )(Excluding GST).1,442.00Sqm.
4Bituminous Concrete:- Providing and laying bituminous concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 30) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per Sr No. 5.8 & MoRT&H Specification Ref. No. 509 (Including Cost of bitumen )(Excluding GST).36.00cum