| Tender ID | 5018399 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Rehabilitation Work Of Damaged Portion Of Lining Of Mwgc From Km 71.000 To 71.800, Km 72.400 To Km 73.500 And Km 74.450 To Km 74.700 Irrigation Division Kushinagar In District Kushinagar |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 03 Aug, 2026 |
| Document Cost | 7354.00 |
|---|---|
| EMD | 3886000.00 |
| Estimated Cost | 0.00 |
| City | Kushinagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 919.50 | Cum |
| 2 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 41326.00 | Cum |
| 3 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 10454.04 | Cum |
| 4 | Plain Cement Concrete in M-15 Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. > 2.0, Crushed Stone dalla grit of nominal size of 4.75 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 4798.65 | Cum |
| 5 | Laying CC block (300x600x150) in M20 Grade of Concrete with Coarse sand, Crushed Stone dalla grit, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), iucluding labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 217.17 | Cum |