| 1 | Cleaning of GEB reclaimer, GMDC reclaimer, Tech-Pro System, TP1, TP2, TP3, Conveyor N3A, ERH, Conveyor L5, L6, L7 & L8, Conveyor N2A including conveyors, chutes, Tunnel, structure, walk ways, grills, stair case, gallery, deck plate, floors, equipment, drive house etc. | 12.00 | Job |
| 2 | Cleaning of Penthouse, conveyor 1 & 2, JT1A , Conveyor 1A & 2A including conveyors, chutes, Tunnel, structure, walk ways, grills, ventilation system, staircase, gallery, deck plate, floors, equipment etc. | 12.00 | Job |
| 3 | Cleaning of JT 2, Conveyor 5 & 6, Crusher House, Conveyor 3 & 4 including conveyors, chutes, Tunnel, structure, walk ways, grills, stair case, gallery, deck plate, floors, equipment etc. | 12.00 | Job |
| 4 | Cleaning of bunker floors, Shuttle conveyor 13 & 14, conveyor 11 & 12, 7 & 8 including cleaning of conveyors, chutes, structure, walk ways, grills, stair case, gallery, deck plate, floors, equipment etc. | 12.00 | Job |
| 5 | To carry out water sprinkling round the clock at LHP stack yard (GMDC & GEB reclaimer yard) or at any other locations of LHP system and to cover/remove tarpaulin sheet | 12.00 | Job |