Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4838421 |
|---|---|
| Organisation Name | Energy And Petrochemicals Department |
| Tender Brief | Corrigendum : Providing And Lying Waterproofing Treatment At Various Locations In Plant Kltps (phase-ii) |
| Last Date For Submission | 11th Aug, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 2950.00 |
|---|---|
| EMD | 91193.00 |
| Estimated Cost | 0.00 |
| City | Kutch |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Removing of existing Bitumen waterproofing membrane including stacking of serviceable materials and disposal of unserviceable materials with all lead and lift per requirement and including tools & tackles. | 1045.00 | SQM |
| 2 | Prepare the surface thoroughly by apply grinding on surface and open all crack and joint should be filled with using non shrink grout Dr. Fixit Pidigrout 10M cleaning, washing and removing dust, dirt, oil, grease and loose particles. Damaged or hollow portions, sharp edges etc must be cut and repaired if required. | 3540.00 | SQM |
| 3 | Providing and laying cement concrete flooring 1:2:4 (1- cement: 2-coarse sand: 4-graded stone aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat cement. (A) 40mm thick | 275.00 | SQM |
| 4 | Providing and applying Dr. Fixit roof seal ultra-waterproofing on roof slab and different junctions at roof slab. (a) Apply first coat of Dr. Fixit prim seal on surface with dilution of 1:0.5 with water by brush or roller (c) After apply first coat apply second coat of Dr. Fixit roof seal ultra UV stable membrane white coating on roof slab with interval of 12 hour on entire surface properly by brush or roller (d) Surface should be touch dry within 2 hour. | 3540.00 | SQM |
| 5 | Removing and re-fixing existing GI / metal / fiber / AC roof sheets from given structure. Care to be taken while removing the sheets so as to save the sheets from damage. The roof sheets shall be removed carefully from existing place and re-fixing the same with all required material, tools-tackles etc complete. The agency has to arrange for any material required for re-fixing the sheets. | 380.00 | SQM |
14 Days Left