| Tender ID | 4852300 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Providing Water Supply Facility To Dhandal (ghodi Goth) In G.p. Salgran By Installation/fixing Of M.s. Tank 270 Ltrs Capacity, P/l/j Testing Of Hdpe Pipe 25 Mm Dia And Construction of Public Stand Post 1 No |
| Last Date For Submission | 15th Jul, 2026 |
| Opening Date | 16 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 4170.00 |
| Estimated Cost | 208225.00 |
| City | Lahul and Spiti |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Fixing of M.S. tank 270 Ltr. Capacity (made up of 4mm thick steel plate) with in all lead and lift as per direction and to the entire satisfaction of engineer in charge. | 1.00 | No. |
| 2 | Excavation in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed with in all lead and lift as per the direction of engineer in charge. 100% Pick Work | 0.46 | Cum. |
| 3 | Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) of specified grade excluding the cost of centering and shuttering as per the direction of Engineering-in-charge.- All work up to plinth level. | 0.29 | Cum. |
| 4 | Random rubble masonry/Polygonal rubble masornry (uncoursed/ brought to courses) with hard stone of approved quality in foundation and plinth i/c levelling up with cement conrete 1:6:12 (1 cement:6 sand :12 graded stone aggregate 20 mm nominal size) at plinth level in cement motar 1:6 ( 1 cement:6 sand) including curing complete as per direction and to the antire satiafaction of the Engineer-in- charge in all lead and lifts. | 0.57 | Cum |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) of specified grade excluding the cost of centering and shuttering as per the direction of Engineering-in-charge.- All work up to plinth level. | 0.17 | Cum. |