Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3700441 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Construction Of 21.00 Km Of Composite Geo-tube Embankment In Dhemaji And Lakhimpur Subproject (dhemaji District) Lot 2. |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 07 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 2000000.00 |
| Estimated Cost | 0.00 |
| City | Lakhimpur |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Filling of geo-tubes (25m long and 2.5m filled ht.) with sand by using mud pump as per drawing and technical specification while binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 2.5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed, including all loading, unloading and handling charges and local carriage upto a distance of 250m, etc., complete as directed. | 400.00 | Nos. |
| 2 | Earth work in embankment by tractor trailer carriage by Mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debris, breaking clods up to 4cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500m distance, etc. complete as directed. For initial Lead upto 1.00 km for all lifts. For beyond initial 1 Km & up to 10.00 Km & for all lifts | 506595.01 | cum |
| 3 | Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed. | 287437.00 | Sqm |
| 4 | EMP IMPLEMENTATION COST | ||
| 5 | Obtaining and submission of copies of all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction | 1.00 | Lumpsum |
4 Days Left