Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4212065 |
|---|---|
| Organisation Name | Uttar Pradesh Jal Vidyut Nigam Limited |
| Tender Brief | Corrigendum : Supply Erection Testing And Commissioning Of 05 Nos. Mccb Switch Disconnectors Cubicle And Aluminium Bus Bar Along With Dismantling Of Existing Old 0.4kv Switch Disconnectors At Various Places Of Matatila Power Station. |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 19 Jun, 2026 |
| Document Cost | 1770.00 |
|---|---|
| EMD | 32000.00 |
| Estimated Cost | 0.00 |
| City | Lalitpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | a) Dismantling of existing old 0.4KV switch disconnectors at various places of power Station. (01 Job) (as per Scope of work) b) Supply, Erection, Testing & Commissioning of 04 Nos. 32A, 06 Nos. 63A, 06 Nos 150A & 02 Nos. 320A MCCB Switch Disconnectors with Aluminum bus bar & cubicle panels at AVR Floor (01 Set) (as per Technical Specification & Scope of work) Make- ABB/Siemens/Schnider/L&T c) Supply, Erection, Testing & Commissioning of 08 Nos. 32A, 02 Nos. 63A & 02 Nos 150A MCCB Switch Disconnectors with Aluminum bus bar & cubicle panels at workshop.(01 Set) (as per Technical Specification & Scope of work) Make- ABB/Siemens/Schnider/L&T d) Supply, Erection, Testing & Commissioning of 06 Nos. 32A, 04 Nos. 63A, 02 Nos 150A MCCB Switch Disconnectors with Aluminum bus bar & cubicle panels at Apex Room. (01 Set) (as per Technical Specification & Scope of work) Make- ABB/Siemens/Schnider/L&T e) Supply, Erection, Testing & Commissioning of 06 Nos. 32A, 02 Nos. 63A & 03 Nos 150A Switch Disconnectors with Aluminum bus bar & cubicle panels at T- off cubical (01 Set) (as per Technical Specification & Scope of work) Make- ABB/Siemens/Schnider/L&T f) Supply, Erection, Testing & Commissioning of 02 Nos. 32A, 02 Nos. 63A, 02 Nos 150A & 04 Nos. 320A Switch Disconnectors with Aluminum bus bar & cubicle panels at Dam Top (01 Set) (as per Technical Specification & Scope of work) Make- ABB/Siemens/Schnider/L&T Note:-1. Whole work shall be carried out on turnkey basis. | 1 | Job |
6 Days Left