Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4076990 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Janpad Pauri Garhwal Ke Vidhanshaba Chetra Lansdowne Ke Vikaskhand Riknikhal Ke Antragath Pmgsy Se Hastantarit Kandalsera Quirali Motor Margh Ke Km 1 Se 12 Tak Me One Time Mantaience Heytu Sudharikaran Aadi Ka Kariya |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 386000.00 |
| Estimated Cost | 0.00 |
| City | LANSDOWNE |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.[Grading of no-3] (22.4 - 53 mm Size) 4-8-3-A By Manual Means | 1026.51 | Cum. |
| 2 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. | 9600.00 | Mtr. |
| 3 | Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge. | 48.00 | Nos. |
| 4 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 413.17 | Cum. |
| 5 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 25.87 | Cum |
17 Days Left