Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4035432 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Two Additional Classroom At High School Phyang ( By Way Of Wooden, Flooring And Local Toilet ) |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 09 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 42180.00 |
| Estimated Cost | 2109058.00 |
| City | LEH |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.Polished Granite stone slab of all colour and texture except Black, Cherry/Ruby Red | 67.69 | cum |
| 2 | Providing & fixing 12mm thick pre laminated flooring of approved brand as per direction of Engineer incharge complete job AC-4 including carriage classroom. | 111.48 | sqm |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 5.94 | cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.01 | cum |
| 5 | Dumping stone including cost of stones in Horizontal on level. | 1.01 | cum |
19 Days Left