Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4458349
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Reapir For Repacement Of Ber Chs, Space Heater Alongwith Connected Work At Af Stn Leh
Last Date For Submission4th Jul, 2026
Opening Date06 Jul, 2026
Cost
Document Cost1000.00
EMD170500.00
Estimated Cost9700000.00
Location
CityLEH
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply, Installation ,commissioning and testing of Central heating plant with glycol based Hot water generator of minimum capacity 2.0 lakh K Cal/hr using kerosene/HSD oil complete with combustion chamber and equiped complete with automatic monoblock burner assembly fire tubes, control panel with sequence controller, photo cell for flame failure, HT transfer electrodes, blower assembly, electric panel, mounting frame, pressure gauges at inlet and outlet suitable for operation on 50 Hz, 3 phase 440 volts AC supply complete all as specified and directed Make: Thermax, Ecoflame, Western, Rapidtherm, Alphatherm (a)Heater unit:-Heat exchanger ,consisting of closely wound, helical concentric coils, arranged to give adequate no. of passes on flue gas side & made out of ERW tubes confirming to IS 3059 Pt-I suitable for high temperature all as per manufacturer design and of required head and capacity . (b) Pressure jet burner:-Suitable for light oil firing with stepless modulation mechanism all as per manufacturer design and of required head and capacity. (c) Combustion air fan with drive motor assembly all as per manufacturer design and of required head and capacity. (d) Control Panel : Dust protected pre-wired unit mounted air cooled control panel housing a burner management system , switchgear consisting of contactors, overload relays, fuses and MCB etc.all as per manufacturer design and of required capacity. Note :- (I) The boiler shall be installed in system of (1W+1S) (II) The tenderer should get the plant installed by any of the original equipment manufacturer with recommended makes of compatible components of items. (III) The boiler minimum specification should be as under :- (i) The boiler inner shell be made from carbon steel with dished ends (curved type) with thickness as per boiler design of OEM. (ii)Outer shell be made from carbon steel with thickness as per boiler design of OEM. iii) Boiler tube shall be seamless MS tube for quality commensurate with the boiler requirement . (iv) The front door shall be openable lined with high grade insulation and refactory (v)High efficient, low noise imported monoblock burner (Benton/Rello) (vi)The boiler shall be insulated with 50mm thick resin bonded fibre glass wool and cladded with 22 guage GI sheet (epoxy pointed) or any other thermal insulation as per OEM design. (vii)Pre wired control panel (made from 18 guage CRC sheet ) Main incomer, MCB in/out temperature controller (digital)fault indicating light for water high temp, burner trip,flue temp, with alarm, hour meter for maint schedule etc. (viii) 1 set of oil piping from unit to burner . (ix) It includes suitable concrete foundation for Boiler .2.00Each Job
2(B) FLUE GAS CHIMNEY : Supply and installation of mild steel flue gas chimney made out of 3 mm thick mild steel sheet, minimum 1.20 m above the highest point of the plant room including connection to independent boiler -02 Nos. (separate for each Boiler) (C) Day Oil Storage Tank Supply, installation, testing and commissioning of Kerosene/HSD oil day storage tank rectangular insulated mild steel (IS 2062) construction with capacity of 990 litres complete with inlet, outlet, over flow drain and vent with flame arrestor. Tank shall be made out of 4mm thick mild steel sheet and will be provided with supports made out of minimum 50 mm dia medium grade pipe to keep tank base at minimum 1000 mm above finished floor level, service the tank shall be provided with level switches for ON-OFF operation of transfer pump. The tank shall be provided with level switches for on-off operation of transfer pump. Extra high level and extra low level alarm shall be provided. Tank and structure shall be painted with synthetic enamelled paint of approved colour as decided by the GE over two coats of red oxide paint, complete all as specified-02 nos and directed. (D) Glycol Expansion Tank Supply and installation of overhead Glycol expansion tank of size 990 Ltr made out of 5 mm thick mild steel cylindrical tank complete covered with 13mm closed cell elastometric insulation complete with removable lid, in/out/drain/overflows system mounting arrangement making connections etc complete all as specified and directed. ( E) Thermic Fluid ( Glycol) Makeup tank Supply and installation of 2000 ltr capacity MS tank madeout of 5 mm thick mild steel cylindrical/ rectangular with removable lid, in/out/drain/overflows system mounting arrangement making connections etc complete all as specified and directed ISI marked. NOTE :-( i) Anything missed out above, but required for smooth opertation of central heating system is deemed to be inclded in the quoted rate. (ii) The capacity of boiler given are minimum estimated, however on detailed calculation if the capacity needs to be enhanced for achieving the desired climating condition mentioned in the contract, is deemed to be included in the quoted rate and accordingly contrator is advised to quote their rate. NO DO in this regard in future shall be admissible.
3Transfer gear oil pump fuel (Self priming): Supply installation testing and commissiong of self priming rotary gear transfer pumps of capacity minimum 15 LPM at minimum 10 mtr Head for Kerosene or HSD oil complete with base mounting frame. PCC foundation including holding down bolts, coupling guard and TEFC flame proof motor 2 HP and other accessories required for commissioning etc complete all as specified and directed.2.00Each
4THERMIC FLUID/ EHYLE GLYCOL CHARGE Supplying and filling of mono ethylene glycol/ Thermic Fluid concentrate alongwith the necessary additives and inhibitor as per IS- 5759- 2006 in cognition and sealed in barrels. The freezing temperature shall be below (-) 25OC, all specified. However the mode of payment and operations involved for this item shall be as under:- Notes: (a) Mono ethylene Glycol in concentrated form shall only be measured and paid under this item. (b) Material and labour for filling including first filling required for operation of CHS plant (c) Any other additives and inhibitors as per the requirement laid down in relevant IS shall be also deemed to included in quoted rates. (d) Empty barrels shall be property of MES.5000.00Ltrs
5Hot liquid Pumping System Supply, Installing, testing and commissioning of pumping system consisting of horizontal suction and delivery Hot/Chilled liquid pump sets capable of delivering minimum 10 LPS of water against minimum 25 meter head at outlet 1500 RPM including primemover squirrel cage induction motor with TEFC enclosure of 5.0 horse power to drive the pump efficently with class 'F' insulation, 1500 rpm synchronous speed, operating on 415+ 10% volts, 3 phase, 50 Hz A.C. supply.( 01 working + 01 standby)-02 Nos and complete as per specification. The system shall comprise of the following: (ii) XLPE insulation of suitable thickness duly cladded by aluminum sheets of 0.5mm thickness and properly clamped to pumpsets as per specifications and required -01 Lot. (iii) Mounting frame with Antivibration pads for 2 Nos of Pumpsets -01 Lot (iv) Interconnecting piping with valves duly insulated for 2 Nos of Pumpsets -01 Lot (v) RCC cement concrete foundation for the pumping unit as per OEM for 2 Nos of Pumpsets -01 Lot.3.00Each Job
4th Jul, 2026

6 Days Left