Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4274351 |
|---|---|
| Organisation Name | Department Of Agriculture |
| Tender Brief | Mission For Integrated Development Of Horticulture National Of Horticulture Mission (midh 202324) Sh Installation Of Garden Lights Along The Foot Path Of The Garden At Lembucherra Govt Orchard. |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 19 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 39248.00 |
| Estimated Cost | 1962398.00 |
| City | Lembucherra |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil.(A.)Pole=225 nos X0.30 m X 0.30 m X 0.60 m=12.15 cum,Panel base=2 X1.50 X0.45 X 0.30=0.405cum ,2 X 1.00 X 0.45 X 0.30=0.27 cum | 12.82 | Cum |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.(Pole=225 nos X0.30m X 0.30 mX 0.100m=2.025 cum) Panel base=1.50 X 1.00 X 0.100 =0.15 cum ,1.00 X 0.50 X 0.400 =0.20 cum SOR-2023 | 2.375 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: a)1:5:10 ( 1 Cement: 5 fine sand : 10 graded well burnt brick aggregate 40 mm nominal size) (Pole=225 X0.30 X 0.30 X 0.100=2.025)SOR-2023 | 2.025 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)(A)Pole=225 nos X0.30m X 0.30m X 0.70m=14.175 cumSOR-2023 | 14.18 | Cum |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) Panel base=1.50 x1.00 x 0.100 =0.15 cum, 1 .00 x 0.50 x0.400=0.20 cum,SOR-2023 | 0.35 | Cum |
Closed