| Tender ID | 5017176 |
|---|---|
| Organisation Name | Zila Parishad |
| Tender Brief | Construction Of 06 Acr (additional Class Room) In Residential Upgraded High School Tumyupat Dist Lohardaga |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 370600.00 |
| Estimated Cost | 18290751.00 |
| City | Lohardaga |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 493.725 | cu.m |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 246.862 | cu.m |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 320.921 | cu.m |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 25.357 | cu.m |
| 5 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 291.367 | cu.m |