| 1 | Repairing of old or damaged office chair, with teak wood Frame, recaning of chair seat and back both with plastic strips, flint paper, spirit polish on exposed surface of wood work. including cost of all material, Labour, T&P, transportation etc, also including all taxes but excluding GST. All work shall be carried out as per direction of Engineer-in-charge. | 13.00 | No |
| 2 | Repairing of old or damaged office table with teak wood Frame, teak wood beading, 19mm ply board ISI marked, iron nails of different sizes, 1 mm thick Mica, Drawer Locks, Knobs, flint paper, spirit polish on exposed surface of wood work,. Including cost of all material, Labour, T&P, transportation etc, also including all taxes but excluding GST. All work shall be carried out as per direction of Engineer-in-charge. (5x3x2.5)' | 1.00 | No |
| 3 | Repairing of old or damaged Dining chair, with teak wood Frame, foam Cushion seat, tapestry Cloth, iron nails in different sizes, flint paper, spirit polish on exposed surface of wood work. including cost of all material, Labour, T&P, transportation etc, also including all taxes but excluding GST. All work shall be carried out as per direction of Engineer-in-charge. | 16.00 | N0 |
| 4 | Repairing of old or damaged Dining Table, with teak wood Frame, 19 mm ply board ISI marked, 1 mm thick mica, teak wood beading, iron nails in different sizes, flint paper, spirit polish on exposed surface of wood work. including cost of all material, Labour, T&P, transportation etc, also including all taxes but excluding GST. All work shall be carried out as per direction of Engineer-in-charge. (Size-5X3)' | 2.00 | N0 |
| 5 | Repairing of Old or Damaged Sofa Set with armrest comprising of Three-Seater one nos. & single-seater two nos., including foam, foam cushion, spring, nariyal jata, tapestry Cloth, mango wood, sheesham paya, koka nails, flint paper, iron nails in different sizes, spirit polish on exposed surface of wood work including cost of all material, Labour, T&P, transportation etc also including all taxes but excluding GST. All work shall be carried out as per direction of Engineer-in-charge, | 2.00 | Set |