Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3990843 |
|---|---|
| Organisation Name | Uttar Pradesh Projects Corporation Limited |
| Tender Brief | Construction Of 2 Nos 30 Prisoners Barrack (g) At District Jail Gonda (u.p.) |
| Last Date For Submission | 24th Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 17700.00 |
|---|---|
| EMD | 420000.00 |
| Estimated Cost | 20976000.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil | 339.507 | CUM |
| 2 | Excavating , Supplying , stacking and filling of local earth ( including Royalty) by mechanical transport up to lead of 5.0 KM also including ramming and watering of the earth in layers not exceeding 20cm in foundation trenches, plinth, side of foundation etc. complete for all lift Ground Floor | 25.391 | CUM |
| 3 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. Ground Floor | 84.829 | CUM |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 117.091 | CUM |
| 5 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti- termite treatment (excluding the cost of chemical emulsion) : Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300 mm including excavation channel along the wall & rodding etc. complete: Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor : With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | 630.862 | SQM |
10 Days Left