Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4037216 |
|---|---|
| Organisation Name | Uttar Pradesh Housing And Development Board |
| Tender Brief | Construction Of Boundary Wall For Kasturba Gandhi Vidyalaya Phool Behar At District- Lakhimpur Kheri.(u.p.) |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 07 May, 2026 |
| Document Cost | 3540.00 |
|---|---|
| EMD | 115000.00 |
| Estimated Cost | 5730000.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil 0.30 m & Avobe (DSR -2.6.1) | 484.92 | CUM |
| 2 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation (DSR -4.1.8) | 58.13 | CUM |
| 3 | Providing and laying in position specfied grade of reinforcement cement concrete, excluding the cost of centering, shuttering, finishing & reinforcement. All work up to plinth level. 1:1.5:3 (1 cement,1.5 coarse sand zone-iii,3 graded stone aggregate 20mm. (Nominal size) (DSR -5.1.2) | 96.43 | CUM |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(DSR -5.3) | 14.30 | CUM |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR -5.2.2) | 25.84 | CUM |
19 Days Left